Zellweger ripple injection plant 22kV

  • 12 years ago
Solid state ripple injection plant injecting a test signal in the 22kV CBD network.
Zellweger
Used for load shedding during peak demand periods or frequency sags on the network.
Hotwater systems , streetlights and non - essential loads can be dumped at an instant.

I created this video with the YouTube Video Editor (http://www.youtube.com/editor)