CE MSTE Practice Problem 3 (Applied Mathematics, Surveying, Transportation, and Construction)

  • 2 months ago
Find the expected production in loose cubic meter (LCM) per hour of a 2.3 cu. m. hydraulic shovel equipped with a front dump bucket. The material is common earth with a bucket fill factor of 1.0 .The average angle of swing is 75 degrees, and job efficiency is 0.80
-
paki pindot po sa "LIKE" button mga Engr.
and click SUBSCRIBE na rin po if hindi pa po kayo naka "SUBSCRIBE"

Maraming salamat po sa inyo mga Engineers and Future Engineers.
mabuhay po kayong lahat.
-
FB Page - https://www.facebook.com/MrComputerCiviLEngineer
Tiktok - https://www.tiktok.com/@SolUsmanJr
-------------
CREDIT:
-------------
Soundtrack:
Ace Attorney Dual Destinies - Apollo Justice (I'm fine)
Ace Attorney Spirit of Justice (Credit Theme)

Avatar:
SuperME Cartoon Avatar Maker (mobile app)

Reference:
"Licensure Exams for Civil Engineering" by BESAVILLA
"CE Reference for Licensure Examination" by GILLESANIA
-
#SolUsmanJr
#ceboardexam
#civilengineeringlicensureexam

Recommended