Why Did Mumbai MMR Face A Power Outage on 12th October 2020?

  • 4 years ago
Answer: Four major power transmission lines went under. 65 lakhs consumer were affected. Everything came to a halt.
The Mumbai Trains work on electricity – stopped! Elevators – Stopped! Ventilators in hospitals – stopped! Online Schools stopped! Why did all this happen?
All this happened because the transformers failed.
How to prevent transformer failure? how to reduce transformer failure? what causes transformer failure?
One of the main reason and most important reason for failure is BAD QUALITY / LOW QUALITY INSULATION MATERIALS.
The cost of insulation materials in the transformer, which is one of the most critical product,
is less that than the cost of transportation of the transformer.
Even after knowing that utmost reason for transformer failure is cheap low quality insulation materials,
yet many transformer manufacturers in India still using them to save a little money.

According to a report, the estimated loss due to power outage in Mumbai is Rs 258 crores per hour.
Let me ask you this… is this savings worth it? We do not even have an estimate of human life that was effected due to this!

Does our electricity board need to set up higher standards? Do our transformer manufacturers need to wake up and realize their importance to human life?
All the raw materials which are used by transformer manufacturers in Europe, USA & 1st world countries are easily accessible. Many are available with us.
What cant we “MAKE IN INDIA” a good quality transformer?
If you agree with us, do share this video.

Visit our website www.DOMADIA.net
https://linktr.ee/kairavdomadia
https://g.page/domadia?gm
LinkedIn: https://www.linkedin.com/in/kairav
Twitter: https://www.twitter.com/domadiadotnet
Facebook: https://www.facebook.com/DomadiaOnline
Instagram: https://www.instagram.com/domadiadotnet

Recommended